Employer and vacancy source: Plan International Zambia
The original vacancy details remain available for reference. Applications are closed, so use the employer information and related searches to find active roles.
- EmployerPlan International Zambia
- LocationEastern Province & Central Province, Zambia
- Employer websiteplan-international.org
- Listing sourceZambia Job Alerts
Key details for this vacancy
- Employer
- Plan International Zambia
- Location
- Eastern Province & Central Province, Zambia
- Posted
- August 13, 2025
- Job type
- Full Time
- Category
- Other
Job description
Plan International Zambia is an international non-governmental organization that strives for a just world that advances children’s rights and equality of girls. Our strategic goal is to make significant contribution to vulnerable and excluded adolescent girls to reach their full potential.
In order to achieve the goal, Plan International Zambia (PIZ) through the Eastern and Central Program Area is implementing a project called BRECS (Building Resilience through Climate Smart Sustainable Livelihoods). The (BRECS) project, implemented by Plan International in collaboration with Jesus Cares and Diaconia, aims to enhance the capacity of communities in Central and Eastern Zambia respectively, to adapt and build resilience to the impacts of climate change by focusing on green enterprises, sustainable farming practices, hydroponics systems in schools, protection of children and young people, and promoting women’s access to resources and decision-making.
The boreholes will supply water to the hydroponics using the deep culture method and to the dug-out fishponds to support fish production in the schools.
1. Objectives of the Activity
a) To conduct hydrogeological surveys to identify viable water sources in 6 schools in Eastern and Central Province to support the hydroponics and aquaponics.
b) To drill and equip boreholes in selected schools.
c) To install 2,500-liter water tanks on 6-meter-high stands for water storage and distribution to support fish ponds and hydroponics.
2. Scope of Work
The contractor will be responsible for the following tasks:
a) Preliminary Assessment and Survey
Conduct detailed hydrogeological surveys to determine suitable drilling locations.
Assess site-specific requirements and submit survey reports.
b) Borehole Drilling in close collaboration/ monitored by the Ministry of Local Government and Ministry of water development and sanitation
Mobilize equipment to each site.
Drill boreholes to a depth sufficient to ensure a sustainable water yield 100- 120 meters deep. Payments will be made based on actual meters achieved per borehole.
Conduct yield tests and water quality tests verified by Water Experts from Local Authority & Department of Water
PVC casing and gravel packing as per standards.
c) Borehole Equipping
Supply and install submersible pumps
Provide solar pumping systems
Construct concrete aprons and drainage channels to prevent contamination.
d) Water Tank Installation
Fabricate and install steel tank stands, 6 meters high, properly anchored.
Supply and install 5000-liter plastic/polyethylene tanks (UV-resistant, food-grade quality).
Connect tanks to boreholes with appropriate piping, taps, and fittings.
Ensure overflow and drainage systems are in place.
3. Deliverables
Hydrogeological survey reports for each site.
Fully functional boreholes with pump systems.
Installed 2,500-liter tanks on 6-meter tank stands (one per school).
Water quality test results from certified laboratory.
Completion report including borehole log sheets, yield test results, and photo documentation.
4. Timeframe
Specific timelines per site to be proposed in the contractor’s work plan.
5. Site Locations
Lot 1
Chowa Panga Secondary School- Central Province
St. Paul’s Boys Secondary School- Central Province
Lot 2
Chadiza Boarding Secondary School- Eastern Province
Chanjowe Day Secondary School- Eastern Province
Mbande Day Secondary School- Eastern Province
Mbozi Day Secondary Schools- Eastern Province
Plan International Zambia reserves the right to split the contract award based on Lots and/or award to one contractor
6. Supervision and Reporting
During drilling of the boreholes, the technical works will be supervised by Water Engineer from the Local Authority and District Water Affairs Officer.
All borehole outcomes to be certified by Local Authority Experts & Department of Water in each district
Payments to only be done based off the report by the local experts
Weekly progress reports and coordination meetings required.
7. Project Completion
Upon completion of the installation, the boreholes should meet the specified dimensions and standards. Completion certificate of installations to be done accompanied by report from local authority. A handover should be organized.
8. Other terms and conditions
a. The contractor shall undertake a comprehensive hydrogeological survey and submit findings for approval prior to drilling. The survey must guide borehole siting.
b. The contractor shall be solely responsible for borehole siting based on a hydrogeological study. Plan International Zambia shall not be liable for non-productive or dry boreholes resulting from inadequate siting.
c. A borehole shall be deemed ‘dry’ if it yields less than 0.5 cubic meters per hour during a standardized pump test lasting at least 4 hours
d. In the event that a borehole is determined to be dry, no payment shall be made for drilling activities related to that borehole.
e. Should a borehole be deemed dry, the contractor shall, at their own cost, drill an additional borehole within the same vicinity, subject to new siting and Plan International Zambia, Local Authority Engineer and Department of Water Affairs Engineers approval.
9. Warranty
12 months warranty on pumps and installed equipment.
10. Evaluation Criteria:
Administrative requirements
Company profiles (clearly indicating the current physical address, contact telephone number and valid email address of business)
Certificate of business registration/incorporation with Form III indicating shareholding structure.
ZRA registration certificate; valid tax clearance certificate
Valid Workmans compensation certificate
Drillers MUST have WARMA certification
Failure to submit all documents above will lead to disqualification
Technical Requirements (70 POINTS)
Experience with borehole drilling. Vendor must demonstrate having completed similar works. This will be determined by submission of at least 4 Previous Purchase orders/contracts/completion certificate/invoice. Vendors must also provide contact details of references where work was completed. (20pts)
Equipment and capacity- Vendor must demonstrate ownership of drilling rig and personnel- (25pts)
Methodology and schedule. Vendors must submit methodology that complies with ToR as well as schedule of works (25pts)
Financial Proposal (30 POINTS)
Price Competitiveness (30pts)
TOTAL: 100PTS
The vendor(s) with the highest scores shall be considered for award
All submission for this tender should be addressed to:
The Supply Chain & Administration Manager
Plan International Zambia
St Eugene Office Park, Plot: #2866
Ibex Hill, Off Leopards Hill Road
Private Bag 518X RW
All bid Submissions should be planzamtenders@planinternational.org by 17:00hrs CAT on 28th August 2025. Any submission received after the deadline will not be considered.
All clarifications must be sent to : theresa.nguni@plan-international.org. All clarifications must be received by 21st August 2025. Responses to the clarifications will be sent to all bidders by 17:00hrs on 22nd August 2025.
“Women-owned, led and influenced companies’ are encouraged in this tender.”
